MEPF Site Inspector

Mức lương: Thỏa thuận

Đã hết hạn nộp hồ sơ - 323 lượt xem

Ngày cập nhật: 07/05/2019

Thông Tin Tuyển Dụng

Hình thức làm việc: Toàn thời gian

Chức vụ: Nhân viên

Ngành nghề: Xây dựng, Hoạch định/Dự án

Giới tính:Không yêu cầu

Bằng cấp:Chưa cập nhật

Làm việc tại:Hà Nội


Mô tả công việc

Systra, world leading transport engineering company for urban and rail projects, has been awarded the Project Implementation Consultancy for the Hanoi Pilot Metro Line (Nhon – Hanoi Railway Station) by the Hanoi Metropolitan Rail Transport Project Board. Under this contract, Systra will be in charge of supervision of construction and installation. Currently, the Elevated Stations Package has been awarded to a Construction Company, and civil work activities will start on site.

In order to carry out the supervision mission efficiently, Systra is looking for a professional and competent Vietnamese national staff who can fill the following vacant position for its Hanoi based project office.

MEPF Site Inspector:

Within the project supervision team, and under the responsibility of the Project manager and the Resident Engineer for civil works contracts, the Site Inspector will be in charge of:
• monitoring the work carried out on the elevated station construction site and later to carry out also the viaduct construction site ensuring that the safety is upheld and that the standards of work follow initial plans.
• carrying out regular MEPF inspections, checking quality of MEPF work, searching out any defects, and then reporting his findings to the Site Engineer and Resident Engineer.
• following and reviewing the Contractor’ schedule linked to MEPF, to check the quantity implemented.

Yêu cầu ứng viên

The MEPF Site Inspector should have major knowledge and skills as follows:
• Excellent communication skills, attention to detail,
• organized manner and practical approach,
• understanding of construction regulations and safety issues,
• excellent knowledge of construction industry,
• able to work with a range of construction workers,
• able to meet deadlines, understanding of technical plans.
• At least 5 years of experience in MEPF Engineering.
• Major quality will be the reactivity to anticipate problems, propose solutions and evaluate risks.

Working hours are usually eight to five and mainly 6 days per week, and the Site Inspector will be required to work during day and night shifts and at weekend should a deadline be set. Base for the work will be the site office. Most time will be spent on-site. There might be times when you work at heights, in tight spaces when inspecting constructions. Safety equipment will need to be worn on-site.
The MEPF Site Inspector shall have a degree in construction or engineering. The MEPF Site Inspector shall have the corresponding certificates. A good English level is mandatory.

For interested qualified applicants please send your CV, application letter, and supporting references, to be presented in English , and current and expected remuneration to Vietnamworks

Deadline for CV submission is 02/06/2019
*Important: No CV will be accepted directly in Systra Project Office

Quyền lợi được hưởng

- Under company's policy

Cách thức ứng tuyển

Hồ sơ theo yêu cầu của nhà tuyển dụng khi liên hệ trực tiếp

Giới thiệu về công ty

CÔNG TY SYSTRA S.A - THẦU DV TV THỰC HIỆN DỰ ÁN TUYẾN ĐƯỜNG SẮT ĐÔ THỊ THÍ ĐIỂM TP HN, ĐOẠN NHỔN – GA HN.
CÔNG TY SYSTRA S.A - THẦU DV TV THỰC HIỆN DỰ ÁN TUYẾN ĐƯỜNG SẮT ĐÔ THỊ THÍ ĐIỂM TP HN, ĐOẠN NHỔN – GA HN.
Tầng 12, tòa tháp vp Hòa Bình, 106 Hoàng Quốc Việt, Nghĩa Đô, Cầu Giấy, HN
Người liên hệ: HR Department
Systra, world leading transport engineering company for urban and rail projects, has been awarded the Project Implementation Consultancy for the Hanoi Pilot Metro Line (Nhon – Hanoi Railway Station) by the Hanoi Metropolitan Rail Transport Project Board. Under this contract, Systra is in charge of the design of the metro ...Chi tiết
Systra, world leading transport engineering company for urban and rail projects, has been awarded the Project Implementation Consultancy for the Hanoi Pilot Metro Line (Nhon – Hanoi Railway Station) by the Hanoi Metropolitan Rail Transport Project Board. Under this contract, Systra is in charge of the design of the metro line, the assistance for tendering process, supervision of the construction and installation and assistance for the project management. In order to carry out this mission efficiently, Systra is looking for a professional and competent Vietnamese national staff who can fill the following vacant position for its Hanoi based project office. Ẩn chi tiết
Bạn đang xem tin việc làm MEPF Site Inspector trong ngành được tuyển dụng tại bởi CÔNG TY SYSTRA S.A - THẦU DV TV THỰC HIỆN DỰ ÁN TUYẾN ĐƯỜNG SẮT ĐÔ THỊ THÍ ĐIỂM TP HN, ĐOẠN NHỔN – GA HN.. CÔNG TY SYSTRA S.A - THẦU DV TV THỰC HIỆN DỰ ÁN TUYẾN ĐƯỜNG SẮT ĐÔ THỊ THÍ ĐIỂM TP HN, ĐOẠN NHỔN – GA HN. đang cần tuyển 0 người nhân sự với hình thức làm việc: Toàn thời gian cố định. Yêu cầu kinh nghiệm Không yêu cầu. Website tìm việc làm timviec24h.vn cập nhật tin MEPF Site Inspector cách đây lúc 27/11/2019 00:00:00. Người tìm việc lưu ý không nên đặt tiền cọc khi xin việc . Chúng tôi luôn cố gắng đưa tin tức tuyển dụng nhanh và chính xác nhất cho bạn.

CÔNG TY SYSTRA S.A - THẦU DV TV THỰC HIỆN DỰ ÁN TUYẾN ĐƯỜNG SẮT ĐÔ THỊ THÍ ĐIỂM TP HN, ĐOẠN NHỔN – GA HN.

(0 đánh giá công ty) Viết đánh giá

Địa chỉ: Tầng 12, tòa tháp vp Hòa Bình, 106 Hoàng Quốc Việt, Nghĩa Đô, Cầu Giấy, HN

Quy mô: 25-99 nhân viên


Việc làm tương tự

MEPF Site Inspector

Mức lương: Thỏa thuận | Hạn nộp hồ sơ: Đã hết hạn nộp hồ sơ