Deputy Chief Operating Officer (Solar Power Plant - Tay Ninh Province)
Mức lương: Trên 30 triệu
Đã hết hạn nộp hồ sơ - 133 lượt xem
Ngày cập nhật: 14/11/2019
Thông Tin Tuyển Dụng
Mô tả công việc
1. Manage and operate all technical activities related to the installation, operation and maintenance of solar power plants and transformer stations.
- Direct the operation and maintenance to ensure that the plant operates at maximum capacity.
- Handle and overcome incidents and technical issues.
- Manage health, safety and environmental sanitation tasks at the factory.
- Develop processes and quality management system of the factory
- Manage supplies, equipment, assets at the factory
- Recruit, train, guide and supervise the work of the technical team.
2. Bidding, contractor management
- Examine and appraise to serve as a basis for submitting to the Chief Operating Officer (COO) for approval the bidding documents, organizing bidding for the plant deployment, and operation.
- Control Contractor's activities regarding the Contractor's schedule, costs, quality and compliance with the contractual terms.
- Organize the inspection, review and report to the COO for approval of the acceptance, final settlement, quality and completion records ... of the works at the factory by the contractors.
3. Work with State management agencies in the field of electricity; coordinate with local state management agencies.
4. Other related jobs:
- Make periodic or extraordinary technical reports at the request of State agencies
- Summary of periodic reports at the request of the General Director and the Board of Directors
- Advising the COO to solve problems that arise that affect the quality, progress and efficiency of the project
- Direct the operation and maintenance to ensure that the plant operates at maximum capacity.
- Handle and overcome incidents and technical issues.
- Manage health, safety and environmental sanitation tasks at the factory.
- Develop processes and quality management system of the factory
- Manage supplies, equipment, assets at the factory
- Recruit, train, guide and supervise the work of the technical team.
2. Bidding, contractor management
- Examine and appraise to serve as a basis for submitting to the Chief Operating Officer (COO) for approval the bidding documents, organizing bidding for the plant deployment, and operation.
- Control Contractor's activities regarding the Contractor's schedule, costs, quality and compliance with the contractual terms.
- Organize the inspection, review and report to the COO for approval of the acceptance, final settlement, quality and completion records ... of the works at the factory by the contractors.
3. Work with State management agencies in the field of electricity; coordinate with local state management agencies.
4. Other related jobs:
- Make periodic or extraordinary technical reports at the request of State agencies
- Summary of periodic reports at the request of the General Director and the Board of Directors
- Advising the COO to solve problems that arise that affect the quality, progress and efficiency of the project
Yêu cầu ứng viên
- Educational level: University or higher
- Professional qualifications: Major in Electrical - Electronics; Automation power, Industrial electricity; Energy system or related subjects
- Proficient in English
- Working experience: Minimum of 10 years of experience in equivalent managerial positions; including experience in executing and operating solar power systems.
- Personality: Honesty and responsibility, dynamic, enthusiasm
- Other requirements: Master the process of electrical system operation, electrical safety procedures and electricity industry regulations.
- Working time: Monday to Saturday morning.
- Working place: Tan Chau District, Tay Ninh Province (with houses for employees from other provinces, provide the shuttle car from Tay Ninh to HCM City and vice versa at the weekend).
- Professional qualifications: Major in Electrical - Electronics; Automation power, Industrial electricity; Energy system or related subjects
- Proficient in English
- Working experience: Minimum of 10 years of experience in equivalent managerial positions; including experience in executing and operating solar power systems.
- Personality: Honesty and responsibility, dynamic, enthusiasm
- Other requirements: Master the process of electrical system operation, electrical safety procedures and electricity industry regulations.
- Working time: Monday to Saturday morning.
- Working place: Tan Chau District, Tay Ninh Province (with houses for employees from other provinces, provide the shuttle car from Tay Ninh to HCM City and vice versa at the weekend).
Quyền lợi được hưởng
- Provide the shuttle car from Tay Ninh to HCM City and vice versa at the weekend
- Luch will be served at the canteen
- Houses will be provided
- Luch will be served at the canteen
- Houses will be provided
Cách thức ứng tuyển
Hồ sơ theo yêu cầu của nhà tuyển dụng khi liên hệ trực tiếp
Giới thiệu về công ty

DAU TIENG TAY NINH ENERGY JSC
Tan Dong Hamlet, Tan Hung Commune, Tan Chau District, Tay Ninh Province
Tan Dong Hamlet, Tan Hung Commune, Tan Chau District, Tay Ninh Province
Dau Tieng Tay Ninh Energy Joint Stock Company (DTE) is a joint venture company between Xuan Cau Vietnam Group and Bgrimm – ThaiLan's oldest industrial group. We built and operated solar power plant Dau Tieng 1 and Dau Tieng 2 at Dau Tieng Lake in Tan Chau district, Tay Ninh ...Chi tiết
Dau Tieng Tay Ninh Energy Joint Stock Company (DTE) is a joint venture company between Xuan Cau Vietnam Group and Bgrimm – ThaiLan's oldest industrial group. We built and operated solar power plant Dau Tieng 1 and Dau Tieng 2 at Dau Tieng Lake in Tan Chau district, Tay Ninh province. This is the largest solar power plant project at Asian with a capacity of 420 MW. Ẩn chi tiết
Bạn đang xem tin việc làm Deputy Chief Operating Officer (Solar Power Plant - Tay Ninh Province) trong ngành được tuyển dụng tại bởi DAU TIENG TAY NINH ENERGY JSC. DAU TIENG TAY NINH ENERGY JSC đang cần tuyển 0 người nhân sự với hình thức làm việc: Toàn thời gian cố định. Yêu cầu kinh nghiệm Không yêu cầu. Website tìm việc làm timviec24h.vn cập nhật tin Deputy Chief Operating Officer (Solar Power Plant - Tay Ninh Province) cách đây lúc 13/12/2019 00:00:00. Người tìm việc lưu ý không nên đặt tiền cọc khi xin việc . Chúng tôi luôn cố gắng đưa tin tức tuyển dụng nhanh và chính xác nhất cho bạn.
DAU TIENG TAY NINH ENERGY JSC
Địa chỉ: Tan Dong Hamlet, Tan Hung Commune, Tan Chau District, Tay Ninh Province
Quy mô: Đang cập nhật