Nguyễn Văn Anh
Senior Geotechnical Engineer
Giới tính: Nam
Địa chỉ: 177 Trung Kính - Cầu Giấy - Hà Nội
Thông tin cơ bản
Ngành nghề: Xây dựng
Trình độ học vấn: Thạc sĩ
Ngày cập nhật: 21/01/2019
Hình thức làm việc: Toàn thời gian
Cấp bậc mong muốn: Trưởng nhóm
Mức lương mong muốn: Thương lượng
Mục tiêu nghề nghiệp
I prefer to work in international environment and high pressure
Kỹ năng bản thân
I received Master degree of Geotechnical Engineering at Delft University of Technology in the Netherlands. I have more than 18 years of working experience in Geotechnical Engineering sector for many construction projects. I am good in performing geotechnical interpretations, preliminary geotechnical design calculations, general engineering design including foundation and other relevant sub-structural design. I am a dynamic and creative person and entirely able to work in international working condition with high pressure.
Kinh nghiệm làm việc
From April 2014 to Current
Employer
POSCO E&C
Positions Held
Senior Geotechnical Engineer
Project
Hanoi Pilot Light Metro Line 3 (Section Nhon – Hanoi Railway Station)
Project Information
Contract Package HPLMLP/CP02: Elevated Section – Stations, under Hanoi Pilot Light Metro Line Project, Section Nhon – Hanoi Railway Station.
Client: Hanoi People’s Committee – Hanoi Metropolitan Railway Management Board
Consultant: Systra Ltd.
The elevated station package comprises of 8 elevated stations which are arranged basically along with the elevated section of Metro line 3. Elevated stations are designed with double level structure including concourse level and platform level. Concourse level is where arranged the metro technical areas and also where the passenger receive the value-added services. Passengers arrive to concourse level by four entrance pods connecting the road sidewalk to concourse level. After pass through concourse level, passengers can rise up to platform level to access the train and start the course. This package include eight elevated stations, each station shall constitute a component under this package.
Project cost: about 72.1 million USD
Detailed Tasks Assigned
+ Make calculation and appraisal report for design drawings of bored pile foundation and sub-structures.
+ Make calculation and method statement for shore excavation, slope stability, ground anchorage.
+ Make schedule and supervise the construction of bored pile foundation as approved method statement.
+ Make the method statement, working drawings, schedule, and report for bored pile tests: vertical and lateral static load test, PDA test, CSL test, PIT test, Coring test; and to supervise the tests as schedule.
+ Make the method statement, working drawings, schedule, and report for plate load test to determine bearing capacity of ground.
+ Check, evaluate the quality of construction equipments and construction works.
+ Supervise geotechnical investigation and to make the investigation report (boring, sampling, and in-situ and Lab tests).
+ Supervise and inspect Lab testing for geotechnical materials.
+ Liaise to the Engineer’s and Client’s technical department.
From April 2012 To April 2014
Employer
Getinsa Ingenieria S.L., Spain (Project Implementation Consultant)
Positions Held
Geotechnical Specialist
Project
Noi Bai – Lao Cai Expressway
Project Information
Client: MOT / VEC / ADB loan
Main project features:
The project is a part of Kunming- Hai Phong Transport Corridor starting at Noi Bai in a suburb of Hanoi and ending at Lao Cai, on the border with People’s Republic of China (PRC) in northwest of Vietnam; across 4 big cities in Vietnam: Vinh Yen city, Viet Tri city, Yen Bai city and Lao Cai – ending point.
Length of the highway: 265km grade-separated and access-controlled highway, including
10 interchanges with toll booths and five service areas
The earthwork is 32.346.932 m3 and 45.528.025 m3 of excavation.
119 viaducts with all structures but two, simple structures of prefabricated beams in double T form and height, in most cases, not more than 10 meters, ready to save small rivers, valleys and local roads.
The total number of piles to be built is 5.437 meters, totaling 90.600 linear meters.
A 530 meters long tunnel of 85 m2 useful section. The excavation method used is the new Austrian Method (NATM), with progress in semicircle of 7.35, 7.45 or 7.55 meters.
Project cost: about 1,4 billion USD
Detailed Tasks Assigned
+ Supervise the Contractor making proposal drawings for embankment, high slopes, retaining walls, foundation of box culvert and underpass.
+ Supervise and review calculations and design drawings for soft soil treatment for the embankment (Soil replacement, PVD, Sand Drain, Sand Compaction Pile), cutting slopes, foundations.
+ Supervise and review construction works of embankment, high cutting slope, slope protection methods, retaining walls, foundations as approved method statement and schedule.
+ Supervise and review monitoring works of soft soil treatment (settlement, lateral displacement, pore water pressure, groundwater level) and movement of slope.
+ Supervise and review the geotechnical investigation for soft soil treatment, high cutting slope stability, foundation, embankment and tunnel.
+ Check, evaluate the quality of construction equipments and construction works.
+ Supervise and inspect Lab testing for geotechnical materials.
+ Liaise to Client’s departments and Contractors
From November 2010 to April 2012 (1 year and 6 months)
Employer
Bauer Vietnam Ltd., Germany
Positions Held
Geotechnical Manager / Construction Manager
Project
National Assembly House
Project Information
Client: Ministry of Construction, Vietnam
Consultant: CONINCO JSC.
Main project features: The project is designed in the shape of a square with a meeting room in the middle, two basements, five floors and a parking lot for 500 cars. The Construction Ministry serves as investor of the project while the Government Office will manage the building.
Project cost: 2.5 million USD.
Detailed Tasks Assigned
- Make Project Organization Chart and to assign tasks for Project Sections.
- Make plan and budget for the project.
- Make Master and Detail Working Program.
- Make procedures for management of Quality, Budget, Work Schedule, and S.H.E;
- Make schedule for materials, equipments, manpower
- Mobilize materials, equipments and manpower, and set up the construction site.
- Supervise and manage the project as approved schedule and budget.
- Make daily report and daily inspection schedule.
- Make as-built drawing and as-built document;
- Manage and control sub-contractors, suppliers.
- Supervise and inspect Lab testing for geotechnical materials.
- Check, evaluate the quality of construction equipments and construction works.
- Liaise to Client, Consultant, and Local Government;
- Report to the Director Board.
From December 2001 to November 2010
Employer
Water Resources University, Vietnam
Positions Held
Lecturer
Detailed Tasks Assigned
- To give lecture for subjects namely: Soil Mechanics, Foundation Engineering, Retaining Wall Structures, Deep Excavations, Soil Improvement Techniques, Geotechnical Engineering;
- To implement construction projects as part-time job.
Typical Projects:
Name of Project: Van Dinh pump station
Year: 2002
Location: Ha Noi city, Vietnam
Client: Ministry of Agriculture and Rural Development, Vietnam
Position held: Team Leader
Activities performed:
To supervise the geotechnical investigation, settlement calculation, concrete pile foundation design and stability evaluation for 3.0m depth excavation.
Name of Project: Huu Bi pump station
Year: 2003
Location: Ha Nam province, Vietnam
Client: Ministry of Agriculture and Rural Development, Vietnam
Position held: Team Leader
Activities performed:
To supervise the geotechnical investigation, settlement calculation, slope stability assessment for the river dike.
Name of Project: Ha Trung pump station and channel system enhancement
Year: 2004
Location: Ha Noi city, Vietnam
Client: Ministry of Agriculture and Rural Development, Vietnam
Position held: Team Leader
Activities performed:
To supervise the geotechnical investigation, concrete pile foundation design, settlement calculation, slope stability evaluation for embankment.
Name of Project: Hong river dike
Year: 2005
Location: Ha Noi city, Vietnam
Client: Ministry of Agriculture and Rural Development, Vietnam
Position held: Team Leader
Activities performed:
To supervise the geotechnical investigation, piping erosion and slope stability evaluation for river dike.
Name of Project: Chu river dike
Year: 2006
Location: Thanh Hoa province, Vietnam
Client: Ministry of Agriculture and Rural Development, Vietnam
Position held: Team Leader
Activities performed:
To supervise the geotechnical investigation, piping erosion and slope stability evaluation for river dike.
Name of Project: Suoi Sap 3 hydraulic power station
Year: 2008
Location: Son La province, Vietnam
Client: Bac Minh Investment and Development JSC., Vietnam
Position held: Team Leader
Activities performed:
To supervise the geotechnical investigation for foundation of dam, power station, tunnel system, slope stability evaluation for excavation on completely weathered bed rock, stability assessment of tunnel.
Name of Project: Hat Liu hydraulic power station
Year: 2009
Location: Yen Bai province, Vietnam
Client: An Viet Ha Noi Investment JSC., Vietnam
Position held: Team Leader
Activities performed:
To supervise the geotechnical investigation for foundation of dam, power station, channel system, slope stability evaluation for excavation on completely weathered bed rock.
Name of Project: Cam Ranh ship building yard
Year: 2010
Location: Khanh Hoa province, Vietnam
Client: DAIZO TEC Ltd., Japan
Position held: Team Leader
Activities performed:
- Supervise works at site and laboratory;
- Reporting, As-built drawings and as-built document preparation;
- Works scheduling for workers and equipments;
- Payment certificate preparation for equipments and workers;
From September 2000 to November 2001
Employer
Transport Engineering Design Incorporation (TEDI), Vietnam
Positions Held
Project Engineer
Detailed Tasks Assigned
Name of Project: Chua Ve port rehabilitation phase II
Year: September 2000 to December 2001
Location: Hai Phong city, Vietnam
Consultant: Nippon Koei (Japan)
Client: Ministry of Transport, Vietnam
Position held: Project Engineer
Activities performed:
- Supervise works at site and laboratory;
- Reporting, As-built drawings and as-built document preparation;
- Works scheduling for workers and equipments;
- Payment certificate preparation for equipments and workers;
Name of Project: Yen Lenh bridge
Year: January 2001 to April 2001
Location: Ha Nam province, Vietnam
Client: Ministry of Transport, Vietnam
Position held: Project Engineer
Activities performed:
- Supervise works on site and laboratory;
- Reporting, As-built drawings and as-built document preparation;
- Works scheduling for workers and equipments;
- Payment certificate preparation for equipments and workers;
Name of Project: Cai Lan port
Year: April 2001 to July 2001
Location: Quang Ninh province, Vietnam
Client: Ministry of Transport, Vietnam
Position held: Project Engineer
Activities performed:
- Supervise works on construction site and laboratory;
- Reporting, As-built drawings and as-built document preparation;
- Works scheduling for workers and equipments;
- Payment certificate preparation for equipments and workers;
Name of Project: Dinh Vu port
Year: July 2001 to September 2001
Location: Hai Phong city, Vietnam
Client: Ministry of Transport, Vietnam
Position held: Project Engineer
Activities performed:
- Supervise works at site and laboratory;
- Reporting, As-built drawings and as-built document preparation;
- Works scheduling for workers and equipments;
- Payment certificate preparation for equipments and workers;