
Đinh Nguyễn Hồng Hải
Material & Warehouse Supervisor
Giới tính: Nam
Địa chỉ: 38/15A Bình Giã, phường 8, TP. Vũng Tàu
Thông tin cơ bản
Ngành nghề: Cơ khí/Chế tạo/Tự động hóa, Dầu khí/Hóa chất, Vận tải/Kho vận
Trình độ học vấn: Kỹ sư
Ngày cập nhật: 12/01/2019
Hình thức làm việc: Toàn thời gian
Cấp bậc mong muốn: Trưởng nhóm
Mức lương mong muốn: 12-15 triệu
Mục tiêu nghề nghiệp
I want to be a value employee of a company and become an expert at my position and I want to see my contribution impact positively to the growth of my company.
Kỹ năng bản thân
Supervisory.
Good control.
Good at multi-tasking.
Problem-solving skill.
Work well under high pressure.
Be able to work independently or team-working.
Eager to learn.
Social communication.
Kinh nghiệm làm việc
1. Peb Steel – VTF1:
- August 2017 – present: Production Engineer.
- Planning and preparing production schedule then report to the foreman.
- Receiving fabrication order, shop-drawing and cutting plan from the planning department.
- Organizing the sequences and following up the lead time to make sure meet complete fabricated date.
- Statistic the detail of the project to do the cutting plan.
- Drawing cutting plan and programming for CNC plasma machine.
- Checking dimension of details in the program before cutting.
- Ensuring the materials after cut is in a good shape with enough quantity then move them to auto welding team and fitting team.
- Following up the schedule of jobs closely to arrange suitably for CNC Plasma team.
- Controlling the quantity of drop-out materials in the jobs.
- Creating and updating the drop-out control file, report to the manager as required.
- Getting the ideas from the workers regarding shop-drawing and solve these problems.
- Making the daily report of the working process.
- Checking the revision drawing to implement in reality.
- Giving advices to foreman to solve the problems at work.
2. Petroleum Equipment Assembly & Metal Structure JSC – Enterprise No.3 (March 2014 – June 2017):
- July 2015 – June 2017: Mechanical Engineer/ Supervision/ Material Controller – Turbine Building Unit 1, 2; Main Control Building (Thai Binh Thermal Power Plant 2 Project)
- Executing Structure Package, Mechanical & Electrical Equipment Package, Piping Package.
- Supervising daily activity at the site.
- Supervising structure erection of Turbine Building – Unit 1&2 and Main Control Building.
- Receiving the fabricated structure for the erection at site.
- Requiring the sub-contractors to provide superior materials to ensure installation progress.
- Supervising the fabrication/ erection of piping systems - Turbine Building Unit 2.
- Erecting the fabricated piping systems (lining and critical piping system).
- Fabricating and erecting the small bore piping, pipe rack system.
- Supervising equipment erection of Turbine Building Unit 2.
- Receiving the equipment from the contractor and transporting them to the installation location.
- Making daily and weekly report of the construction at the site.
- Supporting the site manager to issue the plan for the following week.
- Following up the schedule of the project to ensure the progress of work at the site.
- Drafting the design drawings to statistics varieties of material for each Package.
- Making material request, inspection request to send to the contractor (PVC), and the owner (PVN).
- Inspecting bolt tightening of the structure connection.
- Controlling quantity and quality of materials for the installation at site.
- Inspecting the equipment received from the contractor.
- Supporting the scheduler to make the schedule for the project.
- Settlement volume of constructions and materials.
- Controlling document (drawings, worker certificate, equipment CO/CQ).
- Creating control files (erection, welding, materials…) to follow the schedules of the project.
- Completing and maintaining appropriate shipping/receiving documentary and databases.
- Writing the construction diaries of the project.
- July 2014 – July 2015: Mechanical Engineer/ Quality Controller - Drilling Deck H5, E-House H5 (Te Giac Trang Project), warehouse & workshop (PVC MS’s internal construction), Jacket DKI/17(DKI Project)
- Statistics the variety of materials from design drawings for each construction.
- Reception supplies and report materials.
- Completing record supplies.
- Controlling quantity of materials for the construction at the site.
- Creating and updating the welding control file.
- Checking the connections, weld joints before inspection.
- Sending the request to the owner for inspection.
- Making the cutting plan.
- Making the inspection report for weld joints.
- Settlement volume of constructions and materials.
Học vấn bằng cấp
- Diploma’s Degree in Chemical Engineering Technology at Ba Ria - Vung Tau University.
- FURTHER EDUCATION: Achieve A, B Computer Certificate (Excellent).